Product range
What we make
Five product lines cover everything from a one-off apartment order to fitting out an entire institution under a tender. Below is what each includes and what drives the timeline.
01
Kitchens
A complete kitchen set: carcasses, fronts, countertop, built-in appliances per the client's specification.
Designed for the specific floor plan — there is no standard size range, measurement is mandatory.
Production takes one and a half to three weeks after the estimate is agreed, depending on scope.
02
Sliding wardrobes & dressing rooms
Carcass, sliding system with runners, interior fittings (rails, shelves, drawers).
From a wardrobe built into a niche to a free-standing dressing room.
Production takes one to two weeks.
03
Office furniture
Reception desks, meeting tables, workstations, document storage systems.
Single items or a full office fit-out under one project.
Timelines depend on volume — from one week for a single item.
04
Institutional furniture
Desks and cabinets for schools and kindergartens, furniture for dormitories and medical and social institutions.
Produced in batches to a single specification — relevant for tenders and public procurement.
The batch timeline is agreed separately and fixed in the contract.
05
Retail fixtures
Shelving, counters, checkout zones, display cases built for a specific retail format.
To a chain standard or an individual layout project.
Production takes one to two weeks for a standard set.